Abstract

The article analyzes the technical condition of urban reinforced concrete bridge structures. The authors studied the technical passports of all bridges and overpasses in Tashkent and made direct technical inspections of more than 10 bridge structures. As a result, most of the shortcomings and defects of the existing bridge structures in the city were revealed. In Tashkent, there is a significant number of reinforced concrete bridge structures, the service life of 60 to 100 years (24% of the total number), a significant part of which (42%) has been operated for many years without major repairs. A "four-level" approach is proposed, which contains four stages of analysis, and evaluates the technical condition of the operated reinforced concrete bridge structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.