Abstract

Within last years, construction projects have quickly accelerated in both number and size. This study deals with some of effects of performance management and its outputs from service and cost viewing. By focusing on the relationship between the two main stages in construction projects, that is the design and implementing stages, the research is going on using method of questionnaire survey including four main factors: the state of design process, the state of implementing process, the state of interaction between the two stages (design and implementation) and the state of problems resulted during and after construction. A questionnaire was distributed into 50 construction projects and the data are collected and analysed through SPSS. The results have shown that there is a weak relationship between design and construction stages in local construction projects. Research showed also that it could not be claimed that this situation (weakness of the interaction of stages) is responsible of defects in the performance of these projects, which in turn results in service and cost problems. Interpreting for this situation was that the results reflected the weakness in the actual management performance in the local construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.