Abstract

The implementation of control strategies that reduce energy demand during the machine idle periods is becoming a challenging goal to achieve energy efficiency in production systems. A general policy for switching the machine off/on has been recently proposed in the literature for single machines when a transitory is needed to resume the service. This work analyzes the performance of a production line when a control policy is applied at machine level. In more details, the control of one machine at the time and the control of all machines simultaneously are compared. The considered performance measures are the total energy demanded per part and the system throughput. Numerical results are based on discrete event simulation, and a comparison with the most common practices in manufacturing is also reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.