Abstract

This paper presents the power quality analysis of Jeju island power system connected with wind farms during HVDC system overhaul period on the wind power fluctuation. It is for indicating the influence of wind farm operation in steady and transient state in Jeju island power system. For the computer simulation, three kinds of main item are modeled, which are several wind farms, thermal power plants and Jeju power loads. To analyze the influence of the wind power generation to the Jeju power system on the diverse power penetration, two kinds of simulations are carried out by using the PSCAD/EMTDC program. One is the steady state operation when several wind farms in Jeju island are disconnected from the Jeju power grid instantaneously. With the comparison of these results, it is useful for analyzing the power quality of Jeju power system for penetrating the wind farms to the power grid without any harmful effect.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.