In the 202 section of subway shield Dalian interval in close proximity to existing bridge as the basis, the surface settlement and bridge pier settlement observation station are established. By the 62 day of the crossing construction monitoring, the monitoring data are analyzed in detail. When surface subsidence induced by shield tunnel construction, above the measuring point start speed is faster than settling startup speed measuring points on both sides, about 2-2.5 times, subsidence range higher about 8 to 10 m ahead of time. Away from the pier side first started, and start faster than the side near the pier ,is about 1.2 times , settlement of shield construction are mainly concentrated in the distance before and after the excavation of shield machine 10 m, accounting for 80.72%-81.6% of the total settlement . At highest risk for shield construction area, we should strengthen monitoring and make contingency plans in a timely manner.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.