Abstract

As the object to continuous girder bridges of movable formwork construction,for the same real bridge according to the new code and old code respectively establish finite element mode and for the corresponding calculation and checked, through the comparative analysis about construct materials, calculation conditions and the calculation results, etc,to discuss the difference of the design results between the new standard and the old standard, in order to accumulated useful experience about designing new bridge and reinforcing and reforming old bridge.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.