Abstract

2D-FEM was applied to simulate and analyze several construction schemes, of which shield method was adopted in left tunnel with small inner section and double-heading construction method or cross diaphragm method for right tunnel with large inner section. The results show that compared with the construction scheme that the tunnel with small inner section is firstly excavated, the one that tunnel with large inner section is first accomplished can evidently reduce the disturbance effect on surrounding rock, decrease the settlements of ground. Compared with CRD method, Double-heading construction method has advantages in utilizing the self-supporting ability of surrounding rock and supporting ability of preliminary lining, and also improving safety margin of the second lining.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.