Abstract

The shearing force in the shearing-cut process for a shearing-cut and bending progressive die is far greater than the strip bending force. In this paper, the equation for torque equilibrium is first established. The heuristic rule is then adopted to locate the die center of the shearing-cut and bending progressive die and an offset displacement is set (i.e. rough tuning). The algorithm of the static equilibrium is then used to conduct further fine-tuning of the die center to obtain the central pressure position of the shearing-cut and bending progressive die. The purpose is to reduce the time spent in adjusting the pressure center of the shearing-cut and bending progressive die. Finally, genetic-algorithms (GA) are applied as a solution tool in the analysis of the optimal strip working sequence possessing a smaller difference between the right and left torque in the shearing-cut and bending progressive die. This sequence can improve the approach of rough tuning by applying an offset displacement to the die center followed by further fine-tuning, as mentioned earlier. Instead, only fine-tuning of the die center is required to obtain the die’s central pressure with torque equilibrium for effective reduction of the time spent in adjusting the center of the shearing-cut and bending progressive die.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.