Abstract

A single machine processing different types of parts is considered. Switching from one type to another involves a setup time. The part types may have different processing times. The resulting scheduling problem is treated as a dynamical system for which several feedback policies that are implementable in real time and that stabilize the system are discussed. The main results are a characterization of the dynamics induced by clear-the-largest-work policies and the derivation of bounds on the total work-in-process which are better than those available in the literature.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.