Abstract

In the commissioning of power plant, this paper finds that the shaft seal pressure of small steam turbine does not match the shaft seal pressure of steam turbine, and the shaft seal pressure of small steam turbine is high. On the basis of on-site verification and theoretical calculation, the problem of abnormal shaft seal pressure of small steam turbines was solved by modifying the steam turbine shaft sealing point access point and increasing the small turbine shaft seal overflow device, which provided a solution for similar problems in the future.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.