Abstract

In this paper, we introduce an application study of modelling, analysis and continuous improvement of an assembly system at a furniture manufacturing plant using production systems engineering methods. Analytical models have been developed to characterise the assembly system making multiple products, and recursive procedures have been derived to evaluate line production rate. Lot size analysis is carried out, and bottleneck analysis methods are introduced to identify the bottlenecks, whose improvement can lead to the largest improvement in system performance. Such methods provide a quantitative tool for plant engineers and managers to operate and improve assembly line with high productivity, and are also applicable to other large-volume manufacturing systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.