Abstract

The MG.07 Substation in Matang Gelumpang Dua is located in the PT. PLN (Persero) Customer Service Unit Matang Gelumpang Dua Area Bireun, supplied by the Bireun Main Substation with a feeder capacity of 280 A. The MG.07 feeder supplies transformer PSG.039, loaded at 103.4% of its 250 kVA capacity. The standard load for a transformer is 80% of its capacity. The solution to address this issue is to install an insert transformer to distribute the load from PSG.039. According to data from PT. PLN (Persero) Area Bireun in 2023, the annual increase in electricity usage in Matang Gelumpang Dua Bireun is 8.3%. Therefore, using a 250 kVA insert transformer with an initial loading percentage of 26.8%, it will be able to accommodate the increase in electricity usage for the next five years, with a total loading percentage after five years of 68.3%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.