Abstract

Abstract This paper deals with a practical problem concerning a basic series production system with a buffer facility located between every pair of adjacent equipments which are subject to some degree of unreliability. Only theoretical developments are discussed in this work in which our main aim is to attempt to delineate the complex nature of the problem. Our models yield some explicit relationships that exist between the in-process inventory of work units on the shop floor and the unreliability of machines at work stations. A further paper will report on some practical results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.