Abstract
An optimized tailored nonlinear fluctuation smoothing rule is proposed in this study to improve the performance of scheduling jobs in a semiconductor manufacturing factory. The tailored nonlinear fluctuation smoothing rule is modified from the well-known fluctuation smoothing rules with some innovative treatments. At first, the fuzzy c-means and fuzzy back propagation network approach is applied to estimate the remaining cycle time of every job. Then the nonlinear fluctuation smoothing rules are constructed and tailored to the semiconductor manufacturing factory to be scheduled. Finally, the back propagation network optimization approach is proposed to optimize the rule. To evaluate the effectiveness of the proposed methodology, production simulation is also applied in this study to generate some test data. According to experimental results, the proposed methodology outperformed nine existing approaches in reducing the cycle time averages and standard deviations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.