Abstract

ABSTRACTThe effective utilization of by-product gas is essential for achieving the targets of energy conservation and emission reduction of iron and steel plants in China. The application of deterministic optimization methods may lead to oversimplification and inaccurate estimation of system parameters, and even to system failure. The major contributions made by this study are the development of a gas scheduling optimization model under fuzzy and interval uncertainties and it application to the gas scheduling system of the Baotai steel plant. The integration of type-1 and type-2 fuzzy sets and interval numbers was first used to describe specific model parameters, and the reduced fuzzy chance-constrained programming algorithm and interactive two-step interval algorithm were used for model solution. Compared with practical allocation patterns, it is shown that the proposed model could offer better solutions with more outstanding performance in rapid response to production fluctuations, as well as increases in system revenue.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.