Abstract

The issue of the logistics system is an important issue for the state of Indonesia as an archipelago. Effort to distribute commodities to destinations across the island and attempted export of transport costs become cheaper and faster is a thing to be achieved by all parties including the government of Indonesia. Logistical problems in eastern Indonesia are more complex than the western part of Indonesia. For example, the cost of transport from eastern Indonesia is more expensive than the western part of Indonesia. Therefore, PELINDO II as the company seeks to make the country a new facility in the form of New-port that will replace the port of Sorong Sorong. New-Sorong port will be the largest port in Eastern Indonesia. This paper makes an optimization model with the goal of optimizing shipping container and determines how much capacity should be made to the port of New-Sorong.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.