Abstract
This paper presents a new method for an optimal measurement placement of phasor measurement units (PMUs) for power system state estimation. The proposed method considers two types of contingency conditions (i.e., single measurement loss and single-branch outage) in order to obtain a reliable measurement system. First, the minimum condition number of the normalized measurement matrix is used as the criteria in conjunction with the sequential elimination approach to obtain a completely determined condition. Next, a sequential addition approach is used to search for necessary candidates for single measurement loss and single-branch outage conditions. These redundant measurements are optimized by binary integer programming. Finally, in order to minimize the number of PMU placement sites, a heuristic technique to rearrange measurement positions is also proposed. Numerical results on the IEEE test systems are demonstrated
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.