Abstract

Bechtel National (Reston, VA) have undertaken a FEED study for retrofitting a 2x2x1 natural gas-fired gas turbine combined cycle power plant with post-combustion carbon capture (PCC) for CO2 storage/utilization. The comprehensive programme of work covers the integration of the retrofitted carbon capture and compression plant to the combined cycle power plant, together with the detailed design of an amine-based conventional absorber-stripper scrubbing system with a non-proprietary solvent, 35% w/w MEA. Supporting studies have analysed options for single- and two-stage thermal reclaiming and also examined discrepancies between process modelling packages and the possible scope for alternative trade-offs between capital and operating costs. Given that modelling alone cannot predict commercially-important factors such as solvent management costs a long-term pilot test programme is strongly recommended, with outline details supplied for pilot size and the testing period.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.