Abstract

High Temperature Engineering Test Reactor (HTTR) is the first High Temperature Gas-cooled Reactor in Japan. The plant layout and radiation shielding are designed so that the plant can be operated without any employee receiving a high radiation dose rate. The primary upper shield of HTTR is composed of concrete (grout) and carbon steel. The function of the primary upper shield is to attenuate neutrons and gamma rays generated in the core to satisfy dose rate criterion for the operating floor. Since the HTGR uses high temperature helium as coolant, temperatures of shielding materials could be higher than that of conventional reactors. According to the analytical simulation, the maximum temperature inside of the primary upper shield during full-power operation was estimated to be about 85 °C. Since water content in the primary upper shield concrete depends on its temperature, shielding performance of the concrete under HTTR operational conditions need to be confirmed. Thus the water content of the concrete was experimentally investigated by out-of-pile heat-up tests to 175 °C. According to these tests, a water release model was developed. The out-of-pile heat-up tests showed that the water content in the concrete was larger than 78 kg/m3 up to 110 °C in a 95 % confidence limit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.