Abstract

In this study we present an optimization problem where machine scheduling and personnel allocation decisions are solved simultaneously. The machine scheduling consists of solving a variant of the job shop problem where jobs are allocated in batches and multitasking is allowed. On the other hand, the personnel allocation problem searches for the optimal allocation of human resources to support the facility operation. Although these problems have been extensively studied independently in the literature, the integrated problem has very limited studies, in particular for large-scale industrial environments. We introduce a mathematical formulation for this problem and propose a solution method to evaluate optimal solutions more efficiently. We also implement a rolling horizon framework to test our approach using real-world based instances extracted from an analytical service facility. The results show that, overall improvements of up to 11.6% are achieved compared to the case where no personnel allocation decisions are considered within the scheduling problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.