Abstract

In the last decade interest in work-in-process inventory control has grown. Many papers deal with this topic by considering the manufacturing leadtime as the critical factor that determines the amount of work-in-process. Several authors studied the influence of a batching decision on the average manufacturing leadtime. To this end queueing models with batch arrivals and batch service times were analyzed. One of the underlying assumptions made in the analysis is that the arrival process of the batches can be approximated by a Poisson process for each choice of the batchsize. However, when the interarrival times of individual clients are negative exponentially distributed an Erland distribution may be more appropriate as distribution of the interarrival time of the batches at the production unit. In this paper we consider the single item case. A very tractable analytical approximation for the average leadtime when batches arrive according to an Erlang distribution will be derived. Expressions for the optimal batchsize and the associated minimal leadtime are calculated and compared to experimental values obtained by simulation experiments. The approximation appears to be good. Finally, the huge differences in outcomes between Poisson and Erlang arrivals of the batches are highlighted.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.