Abstract

Change proposals, the introduction of new products, or changes to existing products often require new technologies and equipment to be applied to current projects in an organization or require adjustment to existing technology or equipment. Such project-based changes have an impact on safety, both direct and indirect; however, safety is often not accounted for in each phase of the project nor during the postproject period. To address this issue, this paper presents a general process scheme to be used by project management for integrating safety into each of the different project phases. Elaborating on the general process scheme, the four-leaf clover expert tool for integrating safety into a project, called 4CSπ, was developed. 4CSπ is a tool to be used as an aid to master the changes and to incorporate and minimize the impacts on safety during a project, as well as after project finalization. Keywords change management, expert tool, project management, safety management Language: en

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.