Abstract
Reconstruction and modernization of railway section from Beograd Centar to Stara Pazova with total length of 34.7 km, provides upgrading of existing railway line with the designed speed up to 200 km/h. The paper discusses possible impacts to the environment in terms of vibration and low frequency noise during construction and exploitation of the railway line. The calculation of vibration and low frequency noise propagation and annoyance analysis were made using simulation modeling software package “VIBRA-1”.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.