Abstract

This paper proposes an investment cost recovery based efficient and reliable optimization approach to optimal allocation of thyristor controlled series compensator (TCSC) in double auction power market. The optimization technique has been used with an objective to maximizing the social welfare and minimizing the device investment cost by suitable location and rating of single TCSC in the system. The effectiveness of proposed approach for location of TCSC has been compared with some existing methods of single TCSC placement, in terms of its impact on social welfare, TCSC investment recovery and optimal generation as well as load patterns. The results have been obtained on 5-bus system, modified IEEE 14-bus system and 246-bus Indian practical Northern Regional Power Grid (NRPG) system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.