Abstract
In recent years, distributed scheduling problems have been well studied for their close connection with multi-factory production networks. However, the maintenance operations that are commonly carried out on a system to restore it to a specific state are seldom taken into consideration. In this paper, we study a distributed permutation flowshop scheduling problem with preventive maintenance operation (PM/DPFSP). A multi-start iterated greedy (MSIG) algorithm is proposed to minimize the makespan. An improved heuristic is presented for the initialization and re-initialization by adding a dropout operation to NEH2 to generate solutions with a high level of quality and disperstiveness. A destruction phase with the tournament selection and a construction phase with an enhanced strategy are introduced to avoid local optima. A local search based on three effective operators is integrated into the MSIG to reinforce local neighborhood solution exploitation. In addition, a restart strategy is adpoted if a solution has not been improved in a certain number of consecutive iterations. We conducted extensive experiments to test the performance of the presented MSIG. The computational results indicate that the presented MSIG has many promising advantages in solving the PM/DPFSP under consideration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.