Abstract

This article examines an alliance of heterogeneous factories operating as a production network, in which jobs can be divided into several sub-jobs and independently processed in distributed factories. This problem is considered as a distributed unrelated parallel machine scheduling with splitting jobs (DUPMSP/S). A mathematical model and an effective multi-stage evolutionary algorithm (EMSEA) are proposed, aiming to minimize the total tardiness and total cost of production and transportation. In the EMSEA, the optimization process is divided into three stages according to the population in each generation, and four problem-based initial methods and three knowledge-based local exploitation strategies are embedded to improve its performance. Extensive experiments are conducted to compare the EMSEA with four other algorithms and to compare the scheduling model with no splitting jobs. The results demonstrate that EMSEA is the most promising method in solving the DUPMSP/S, and the job splitting mode is effective.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.