Abstract

No-wait flow shop production has been widely applied in manufacturing. However, minimization of total completion time for no-wait flow shop production is NP-complete. Consequently, achieving good effectiveness and efficiency is a challenge in no-wait flow shop scheduling, where effectiveness means the deviation from optimal solutions and efficiency means the computational complexity or computation time. We propose a current and future idle time (CFI) constructive heuristic for no-wait flow shop scheduling to minimize total completion time. To improve effectiveness, we take current idle times and future idle times into consideration and use the insertion and neighborhood exchanging techniques. To improve efficiency, we introduce an objective increment method and determine the number of iterations to reduce the computation time. Compared with three recently developed heuristics, our CFI heuristic can achieve greater effectiveness in less computation time based on Taillard’s benchmarks and 600 randomly generated instances. Moreover, using our CFI heuristic for operating room (OR) scheduling, we decrease the average patient flow times by 11.2% over historical ones in University of Kentucky Health Care (UKHC).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.