Abstract

An approach, where hysteresis switching logic is used in gain scheduling of PI controller, is proposed and applied practically in the control of boiler drum level of 4× 300MW coal-fired power generation units. The parameterized candidate PI controllers are designed at a number of operating points based on on-site engineering tuning/tests, and, hysteresis switching logic, which is shown theoretically can be used with the aim that switching stops in finite time, is applied to make controller decision over those candidate PI controllers. The unit generation output is used as scheduling variable by the hysteresis switching logic. The proposed controller structure is used to control drum level of 4×300MW coal-fired power generation units at Zouxian Power Generation Inc, P.R.China.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.