Abstract
Grade Engineering (GE) refers to a range of pre-concentration techniques and operating methods to improve mineral feed grades by early rejecting low uneconomic materials prior to energy and cost intensive processing. While inclusion of a GE plant within the mineral value chain may assist the development of realistic strategic mine plans, the existing models that offer solution to the open pit production scheduling problem ignore the important and relatively new GE techniques. This paper presents an overview of a new mathematical formulation that optimizes annual production scheduling of an open pit mining operation with Grade Engineering subject to a set of operational and technical constraints. The computational results show that the proposed method outperforms than the existing models without GE plant.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.