Abstract

The next article describes the application of an alternative soft fault model strategy considering the cross-coupling effect analyse at the structural architecture for hydroelectric power system generator.The scheme is based on the Fuzzy Recursive Decision Feedback Extension (RDFE) tested and verify on a non-linear hydroelectric power system model obtained by a real system.The Timing, Sequencing and Priority Strategy are improved inserting Fuzzy Time Series (FTS) to model a Fuzzy soft fault model for the Scheme proposed.A case of Successful application is explained considering the development of an experiment in the laboratory of the Group of Power traction, quality and generation of power systems in the Puebla Autonomous University.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.