Abstract

We study a scheduling problem with a given number of identical parallel machines, a common job due date and the total early work criterion, i.e., Pm|dj=d|max{X}, which is known to be NP-hard. A new dynamic programming algorithm is proposed, which is more efficient than the existing exact approach for this problem. Based on the proposed dynamic programming, we further design two new fully polynomial time approximation schemes. The effectiveness and efficiency of the new exact and approximation approaches are validated in the computational experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.