Abstract

The new grid operation constraints, allied to the substation automation and intelligence, require the state estimation (SE) to work even more efficiently, with reliability and accuracy. The proposed method for optimally allocating existing phasor measurement unit (PMU) channels and their resources at substations ensures reliability in the SE process even in cases of equipment malfunctioning, and guarantees the quality improvement of the SE. The proposed algorithm has two stages. In the first stage, a genetic algorithm optimally allocates the PMUs. In the second stage, a heuristic method optimises measurement and channel allocation. Equipment failure, missing data, observability issues, methods to reduce critical sets in SE results to preserve the system's observability, are also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.