Abstract

This paper deals with an age-based preventive maintenance for critical systems or structures subject to a gradual degradation phenomenon such as stress corrosion cracking. We analyze a system subjected to different cracks. A crack can be only detected when its length exceeds a detection threshold. When the length of the crack reaches a given threshold, the system fails. The length of the crack is modeled using a gamma process. Furthermore, when the number of cracks detected in the system attains a fixed value, the system fails. Corrective maintenance actions are performed after a system failure. A preventive maintenance is performed when the age of the system is T . Maintenance actions replace the system by a new one with an associated cost. The problem is to determine an optimal planned replacement time T , minimizing the expected cost rate of the system. The analytical solution to the problem is obtained under some general assumptions. A numerical example is shown to illustrate the problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.