Abstract

Operator performance in the main control room (MCR) depends to a great extent on the form and amount of the information on the nuclear plant process status. An unstructured form of data display may result in an increase in the data processing time and in errors in the decisions made by operators. Convenience of the NPP data flow handling is given an increased focus but the process of supplying diagnostic data to operating personnel is neglected by both the developers of technical diagnosis systems and by the MCR interface designers. The paper provides an analysis of the upper-level information from technical diagnosis systems and presents requirements to respective screen forms and implementation options.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.