Abstract

This study attempts to evaluate the applicability of chemical oxidation processes to polish biologically treated effluent of a plant manufacturing hardboard from waste paper to comply with the discharge limit of 120 mg l−1 chemical oxygen demand (COD). In the first step, a chemically assisted settling was applied. The optimum results were obtained with alum plus lime with the alum dose of 200 mg l−1. In the second step, chemically assisted settling effluent was fed into an activated sludge system and over 80% COD removal was achieved. In the last step of the experimental study, a series of ozone oxidation and Fenton oxidation methods were tested to remove residual COD. Ozone oxidation provided 80% COD removal. An ozone dose of 40 mg min−1 with a reaction time of two hours was found to be optimum. Catalytic ozonation by using ferric iron, as well as high pH ozonation, Fenton process and H2O2/O3 oxidation did not prove to be more efficient than plain ozonation under these study conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.