Abstract
IEC 61850 is the established standard for substation communication. Since the standard describes different stages of lifecycle of Substation Automation Systems the demands for specification, testing, and especially simulation differ. The approach described in this study can be used in the different stages and fulfil practical requirements. It describes the requirements for simulation and proposes an implementation applicable. If a single Intelligent Electronic Device (IED) and its data model to be simulated in technical investigation phase is sufficient at Factory Acceptance Testing and Site Acceptance Testing multiple IEDs and utilised services as GOOSE and reports will be needed. In addition, the methods described for indicating test mode/behaviour and simulation indication become important. The simulation has to be embedded in testing environment and interact with tools to be used for visualisation of changes in IED's data model. Advanced services in IEC 61850 like setting groups control, switching device control and file transfer have to be added. The requirements will be discussed from a utility's perspective. The method described can be extended for routine testing and maintenance testing, e.g. after firmware upgrades. An outlook develops a vision to be utilised for automation and control testing.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.