Abstract

Abstract This paper reviews results and experiences from a problem driven method development process within an ongoing oil field development project. Primary driving forces have been the NORSOK initiative to reduce overall project costs and new legislation on health, safety and environment. Four cases are presented, where risk analysis methods and practices have been changed to meet new needs. These cover needs of input to the selection of one platform concept from alternative standard concepts, specification and qualification of cost-efficient safety measures and analysis of the risk of occupational accidents. It is concluded that research may support the development processes through systematic evaluation and documentation. Significant areas of interest are standardization of risk acceptance criteria, development of risk analysis methods for special applications and evaluations of safety management programmes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.