Abstract
The paper proposes a new classification of schedules for resource-constrained project scheduling problems with minimum and maximum time lags between project activities and regular and different types of nonregular objective functions. The feasible region of the scheduling problems represents a (generally disconnected) union of polytopes. In addition to the well-known concepts of active and semiactive schedules, pseudoactive and quasiactive as well as stable, semistable, pseudostable, and quasistable schedules are introduced. The (quasi-, pseudo-, semi-)active schedules are related to different types of left-shifts of sets of activities and correspond to minimal points of certain subsets of the feasible region. The (quasi-, pseudo-, semi-)stable schedules do not allow oppositely directed shifts and correspond to extreme points of certain subsets of the feasible region. The different sets of schedules contain optimal schedules for project scheduling problems which differ in their objective functions. The correspondence between those sets of schedules and vertices of specific polyhedral subsets of the feasible region can be exploited for analyzing schedule generation schemes which have been developed recently for finding solutions to the different classes of project scheduling problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.