Abstract

In railway power supply systems using AC frequencies lower than the public grids of 50/60 Hz, high voltage AC overhead transmission lines in railway grid frequency are used as one measure of strengthening the systems. An increased resistance to overhead high voltage AC transmission lines, may motivate cables for future railway power systems. With the frequency of 50/60 Hz, reactive power produced in lowly utilized cables imposes an obstacle. For low frequency AC, this issue is less significant. Moreover, in converter-fed railways, no reactive power will leak into the feeding public grid. This paper studies AC cables in low-frequency AC railway. Two reinforcement cable solutions are compared with no reinforcement. A simplified load model of trains, with thyristor bridges and DC motors, is used.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.