Abstract

Most conventional control charts focus on detecting a constant mean shift. In reality, however, it is often important to deal with situations where the mean of the monitoring sequence has a dynamic shift pattern, e.g., residuals from a time series. In these cases, the conventional control charts may perform poorly, as they do not consider the information due to what is known as “forecast recovery” contained in the patterned mean shift. This paper proposes a new weighted cumulative sum (WCUSUM) procedure for monitoring a sequence with a patterned mean shift. This method first estimates the dynamic mean of the sequence, then uses the estimates for weighting the incremental in the conventional CUSUM chart. Guidelines for designing the WCUSUM chart are proposed, and the performance is compared with that of the conventional CUSUM chart and other alternatives for detecting patterned mean shifts. It is found that the WCUSUM chart performs far superior to other charts for detecting small to moderate shifts when forecast recovery is present and performs competitively otherwise.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.