Abstract

In this paper, a study on the characteristics and the reduction methods of ground vibration due to the tilting train travelling in the conventional line is carried out. The load transmitted into the ground is computed considering the interaction between the tilting car and the line. This load is then applied in the numerical model for the analysis of ground vibration due to the travelling tilting car. The far-fields of the numerical model are modeled using the dashpot, as one of the most widely used absorbing boundaries in finite element analysis. Using this numerical model, the analysis of the ground vibration characteristics caused by the travelling tilting car and the analysis of the blocking effect of the ground vibration by wave barriers are performed. From the numerical analysis, it is shown that the blocking effect of the trench and the barrier filled with soft material is more effective than that of the barrier filled with hard material.

Highlights

  • The Gyeongbu High Speed Railway in Korea significantly increased the speed of the national railway network in a will to reduce the transportation cost of goods and boost the national competitiveness

  • Improving the speed by reshuffling the alignment can be achieved by adopting an appropriate cant to prevent the overturning of the vehicle or the loss of riding comfort caused by the centrifugal force in the curved section or by flattening the curve to make it practically straight but such solutions are expensive but their applicability is very limited due to the topographical conditions at hand

  • This study computes the size of the wheel loads considering the dimensions of the tilting train, the centrifugal force and the tilt angle so as to calculate the load transferred to the ground during the crossing of a curved section

Read more

Summary

Introduction

The Gyeongbu High Speed Railway in Korea significantly increased the speed of the national railway network in a will to reduce the transportation cost of goods and boost the national competitiveness. There is a serious need in investigating thoroughly the vibration mechanism induced by the interaction between the rail and wheel of the tilting train that will run at high speed on the existing track structure and the characteristics of the ground vibration transmitted to the neighboring structures through the ground during the crossing of the train. In a curved section, the left- and right-side wheel loads have different sizes because of the centrifugal force and the tilting of the train due to the adjusting cant and are transferred to the ground through the rails. This study computes the size of the wheel loads considering the dimensions of the tilting train, the centrifugal force and the tilt angle so as to calculate the load transferred to the ground during the crossing of a curved section. This last result can be explained by the fact that the shear wave propagates without mode conversion

Ground Vibration Reduction by Anti-Vibration Structures
Vibration-Blocking by Trench
Vibration-Blocking by Wave Barrier
Findings
Conclusions
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.