Abstract
This paper is for the revolution and the need for electric vehicles (EV) and its challenges for the charging infrastructure for Pune electric automobile industry. The current growth of EVs is slow due to the issues such as slow charging time, accessibility, lack of charging infrastructure. Identifying the characteristics and demand of fast charging EV load of Pune. Within a radius of 3 km charging station is required in the Pune. Government policies and the Pune municipal corporation initiative towards the charging infrastructure for the smart Pune city. Interaction of electric vehicle and charging station for the availability of charging slots in the charging station to reduce waiting time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.