Abstract

This article presents a streamlined approach to seismic hazard assessment aimed at providing regulatory assurance, whilst acknowledging commercial and program constraints associated with the development of safety–critical facilities. The approach was developed based on international best practice and followed the spirit of the Senior Seismic Hazard Analysis Committee (SSHAC) Level 2 requirements, while incorporating the key features of the SSHAC Level 3 process aimed at achieving regulatory assurance, but with a more flexible implementation. It has also benefited from experience gained by others regarding the implementation of the SSHAC process in projects in the USA, Switzerland and South Africa. The approach has been successfully applied as part of the Safety Case for the new-build nuclear power plant at Hinkley Point, UK. The proposed approach can be considered as a cost-effective solution for the seismic hazard evaluation of safety-significant facilities where a high level of regulatory assurance is required.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.