Abstract

Item‐pool management requires a balancing act between the input of new items into the pool and the output of tests assembled from it. A strategy for optimizing item‐pool management is presented that is based on the idea of a periodic update of an optimal blueprint for the item pool to tune item production to test assembly. A simulation study with scenarios involving different levels of quality of the initial item pool, item writing, and management for a previous item pool from the Law School Admission Test (LSAT) showed that good item‐pool management had about the same main effects on the item‐writing costs and the number of feasible tests as good item writing, but the two factors showed strong interaction effects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.