Abstract
This paper presents a management design approach to assembly line systems (ALS) by considering both the cost and leadtime under demand fluctuations. First, a design procedure based on the 2-stage design method is presented for the ALS with and without stoppers in the installation case of production facilities. Next, the strategic relation of economic traffic and leadtime is considered by introducing the production matrix table. Finally, a positioning strategy (cycle time and number of stations) is discussed for a case in which the leadtime is restricted.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.