Abstract

In this paper, we formulate a model to solve the facility layout problem in Cellular Manufacturing Systems (CMS). This model assumes that the demand rate varies over the product life cycle. The objective is to minimize the total material handling cost and solves both inter- and intra-cell facility layout problems simultaneously. Owing to the problem’s complexity and intractability, we use the simulated annealing algorithm to solve the presented model. The computational results show that the simulated annealing can obtain satisfactory solutions within reasonable time.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.