Abstract
For aircraft manufacturers, the market demand in the nowadays aeronautical industry requires a high reactivity between teams in charge of the design of the aircraft and teams in charge of its production system. One way to increase this reactivity is to help the design architects understand the way the aircraft is produced together with the bottlenecks in the manufacturing process, and to help them evaluate the impact of a design modification on the production system. This paper addresses these two needs. We formally describe the scheduling problem considered, the algorithmic approaches developed, the implemented tool, and results obtained on data from a real production line of the Airbus A320 aircraft family.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the International Conference on Automated Planning and Scheduling
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.