Abstract

It is a hard process to modify master production schedule in a firm having various types of products and final assembly groups. Therefore, the system should automatically make the needed and proper modifications when they are input. Besides, it is of great importance to the firm to remove the errors of demand forecasting so as not to reject customer orders. In this study, a rule-based system for an electromechanical manufacturing company, which is able to rearrange the master production schedule, is presented. This system will provide considerableeasinessofusein themaster production scheduling activities.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.