Abstract

A methodology is introduced for testing the integrity of relay contacts as isolation devices in Class IE circuits. A design activity that installed a new relay established the need for a new type of qualification test. This paper describes the process of establishing the test methodology, the development of the test plan, and the results of testing. It also describes the limitations of applying the results of any specific test to actual field installations, and offers other potential uses of the methodology.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.