Abstract

The assembly scheduling problem (ASP) and distributed assembly scheduling problem (DASP) have attracted much attention in recent years; however, the transportation stage is often neglected in previous works. Factory eligibility means that some products cannot be manufactured in all factories. Although it extensively exists in many real-life manufacturing processes, it is hardly considered. In this study, a distributed three-stage ASP with a DPm→1 layout, factory eligibility and setup times is studied, and a Q-learning-based artificial bee colony algorithm (QABC) is proposed to minimize total tardiness. To obtain high quality solutions, a Q-learning algorithm is implemented by using eight states based on population quality evaluation, eight actions defined by global search and neighborhood search, a new reward and an adaptive ε−greedy selection and applied to dynamically select the search operator; two employed bee swarms are obtained by population division, and an employed bee phase with an adaptive migration between them is added; a new scout phase based on a modified restart strategy is also presented. Extensive experiments are conducted. The computational results demonstrate that the new strategies of QABC are effective, and QABC is a competitive algorithm for the considered problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.